Queenborough latest: pontoons now in place
News just in, as they say on CNN: the 60 metre x 9 metre pontoon (in 3 sections joined together) have now been installed and connected to the All Tide Landing hammerhead. However, the pontoons are not yet available for use.











Good news …
I’m sure it’ll be a boon for many of the larger vessels. I rather suspect that smaller ones would wish to moor ‘inside’ to minimise wave bashing!