Kingsferry Bridge major problems

Peel Ports advise that bridge span lifts will not be possible during peak train operating times and all lifts will take approximately 1 hour to complete. A minimum of 3 hours notice will be required to arrange a bridge span lift. Vessel movements may have to be delayed to facilitate the most efficient use of each bridge span lift.

All leisure vessels requiring to transit the bridge should contact the bridge operator on VHF channel 10 to be advised of the next available bridge span lift time.

NtoM No 08 of 2015 – Kingsferry Bridge – limited span lift capabilities until further notice

Leave a Reply

Your email address will not be published. Required fields are marked *