Kingsferry Bridge to be refurbished

Network Rail have announced that the motors, which date from the 1950s, will be totally replaced in 2017. This should mean an end to disruption caused by the unreliable lifting mechanisms. There will no longer be a limit on the number of lifts in a period of time, subject only to the train timetable.

Leave a Reply

Your email address will not be published. Required fields are marked *